1 load cell wiring to the junction box, Load cell wiring to the junction box, Figure 4-3 – Rice Lake Washdown User Manual

Page 18

Advertising
background image

2K – 10K models: 1.625"

20K models: 2.16"

30K models: 1.66"

14

RoughDeck Low Profile Floor Scale

Figure 4-3. Foot Pad - Side View

6. Route the load cell cables near each corner so that the cable is free from possible contact with each foot.

7. Hold the cable in position with the adhesive-backed cable ties supplied in the hardware kit.

8. Do not cut load cell cables. Coil extra cable before it enters the junction box, tie with cable ties, and insert

the coils into the channel near the junction box.

9. Pass each individual end of load cell cable through its grommet in the junction box cover (or through cable

fittings in the NEMA 4X junction box).

10. Corner correction trimming and calibration is necessary after load cell replacement. Follow instructions in

Section 3.2 and Section 3.3 on page 11.

4.3.1

Load Cell Wiring to the Junction Box

1

4

2

3

Figure 4-4. Corner Numbering - Top View

The four load cells are each wired to their respective terminals in
the junction box according to the corner numbering system shown
in Figure 3, and the coloring code in the load cell specifications.

When using the NEMA 4X stainless steel junction box with strain
relief hubs,

1. Pull excess cable out of the junction box enclosure.

2. Tighten the strain relief hubs with a wrench.

To be watertight, the hubs must be tightened to the point
where the rubber sleeving begins to protrude out of the
hub.

3. Pull on each of the four cables to make sure that do not

slip.

Note

See load cell specifications for proper color code wiring information.