Rice Lake Loadrunner Series Onboard Roll-Off Load Pin, 2.5 User Manual

Page 12

Advertising
background image

Skip weld collar to frame

Note

8

LoadRunner™ Series Installation & Service Manual

Leave access to easily install the bolt and nut that secures the load cell.

Figure 3-5. Skip Weld Collar to Frame

14. Apply grease to each center pivot using existing lubrication points.

15. Reinstall the load pin, lining up the bolt hole with the hole in the collar.

1/2-20 x 5

Screw

Load Pin

Important

Do NOT strike the load cell directly, as it may cause damage to the load cell. Use a wood block (or similar
material) to cushion the load cell, and tap lightly. If the load pin does not go in by hand, or with moderate
tapping, the holes need to be aligned better, or opened up with a grinder.

16. Insert bolt through the top of the collar and secure with nut at the bottom.

Figure 3-6. Insert Load Pin

17. Repeat steps 3 through 16 for the other side of truck.

Advertising