Roll Off Load Pin Installation

11

3.5

Routing Wiring

Because each truck is different, cable routing will be specific to the truck the system will be installed on.

Important

Plan a route that has little or no risk of pinching, stretching or melting the cables.

Use split loom on all exposed cable to protect in areas where damage could be an issue.

Wire tie any excess cable to the frame.

Note

For cab-over type truck cabs, all scale system cabling must run around the main pivot point of the cab-over
hinge. For conventional cabs, look for cab access grommets in the flooring near the driver seat area.

For ease of connection, label the cables used in installation prior to threading through the hole into the cab.

1. Connect 6cables to the load pins.

2. Connect the load pin cables to the Y cable.

3. Connect 15cable and 3cable (if necessary) to the Y cable.

4. Route the 15cable along frame to the indicator through access hole in the cab.

5. Wire tie the cable to the frame approximately every 18 inches.

6. Follow the same route with the inclinometer cable.

7. Route the power cable from the battery to the indicator location.

Load

Pins

Inclinometer

Y Cable

Battery

Transducer

Indicator

Power Cable

15

Cable

6

Cable

Note

Connecting wiring to the indicator is shown in Section 3.6.

Figure 3-10. Wiring Diagram

Advertising