4 concrete deck – Rice Lake SURVIVOR RT Rail Scale User Manual
Page 10
Advertising
6
Survivor RT Installation Manual
2.4
Concrete Deck
1. Install deck pan.
Figure 2-10. Deck pan installed
2. Set manhole frames in desired locations and shim to proper height.
Figure 2-11. Manhole frame
3. Install rebar and pour concrete. After the concrete hardens, cut deck pan from within manhole frame.
Figure 2-12. Rebar installed (left) and pouring concrete (right)
Advertising
This manual is related to the following products: