4 concrete deck – Rice Lake SURVIVOR RT Rail Scale User Manual

Page 10

Advertising
background image

6

Survivor RT Installation Manual

2.4

Concrete Deck

1. Install deck pan.

Figure 2-10. Deck pan installed

2. Set manhole frames in desired locations and shim to proper height.

Figure 2-11. Manhole frame

3. Install rebar and pour concrete. After the concrete hardens, cut deck pan from within manhole frame.

Figure 2-12. Rebar installed (left) and pouring concrete (right)

Advertising
This manual is related to the following products: