Rice Lake SURVIVOR RT Rail Scale User Manual
Page 8
Advertising
4
Survivor RT Installation Manual
Figure 2-6. Module in place
7. Adjust load cell base plate leveling bolts to proper height and level plates.
Figure 2-7. Load cell base plate adjusting to proper height
8. Continue this process at each section, moving down the scale.
9. Install lateral and longitudinal checking brackets and rods. Set check rods level with a horizontal plane to
within
1/2
. Weld Spacer Plates (P/N 71860) to weighbridge to secure.
Figure 2-8. Check rod
10. Install coping by tack welding coping to outriggers making sure to establish a good ground very near the
area being welded. Use 3/4” nuts between coping and pit wall to allow for deck clearance.
Advertising
This manual is related to the following products: