1 load cell wiring to junction box, Load cell wiring to junction box, Figure 4-4 – Rice Lake RoughDeck Rough-n-Ready System User Manual

Page 15: In figure 4-3

Advertising
background image

2K – 10K models: 1.625"

20K models: 2.16"

30K models: 1.66"

Service Information

11

Figure 4-3. Foot Pad - Side View

Route the load cell cables near each corner so that the cable is free from possible contact with each foot. Hold the

cable in position with the adhesive-backed cable ties supplied in the hardware kit.

Do not cut load cell cables. Coil extra cable before it enters the junction box, tie with cable ties, and insert the

coils into the channel.
After coiling excess cable, pass each individual end of load cell cable through its cord grip in the NEMA 4X

junction box.
Corner correction trimming and calibration is necessary after load cell replacement. Follow instruction in

Section 3.2 and Section 3.3 on page 8.

4.3.1

Load Cell Wiring to Junction Box

The four load cells are each wired to their respective terminals in the junction box according to the corner

numbering system shown in Figure 4-4, and the coloring code in Table 4-2.
Pull excess cable out of the junction box enclosure and tighten the cord grip dome nuts with a wrench. To be

watertight, the nuts must be tightened to the point where the rubber sleeving begins to protrude out of the nut.

Finally, pull on each of the four cables to make sure that they do not slip.

1

4

2

3

Figure 4-4. Corner Numbering - Top View

Table 4-2. Load Cell Wiring

Color Cable Code

J-Box Terminal

Red

+ Excitation

Black

- Excitation

Green

+ Signal

White

- Signal

Bare or Clear

Shield

Advertising
This manual is related to the following products: