Figure 3-3. junction box wiring diagram, Figure 3-4. load cell protection, Figure 3-5. junction box diagram – Rice Lake RoughDeck BDP with Portability Option User Manual

Page 10: Floor load cell cable steel cover, 6roughdeck bdp installation/operation manual

Advertising
background image

6

RoughDeck BDP Installation/Operation Manual

Figure 3-3. Junction Box Wiring Diagram

For permanent installations it’s desirable to have the cable routed to the indicator in a manner that will protect the

cable from damage. This method of cable protection in non-washdown applications is shown in Figure 3-4.

Figure 3-4. Load Cell Protection

7. When the interface cable is protected and in its final position, complete connections to the indicator. See

the indicator installation manual for wiring information.

8. If necessary, trim corners as described in Section 5.2 on page 9.
9. Check all strain relief fittings for tightness.
10. Put the cover back onto the junction box assembly and place the junction box back in the scale.
11. Secure the scale junction box cover plate.

Figure 3-5. Junction Box Diagram

CELL 1

CELL 4

CELL 2

CELL 3

INDICA T OR

+EX

–EX

+SI

–SI

100 K

+SE

–SE

+EX

+EX

+EX

+EX

–EX

–EX

–EX

–EX

+SI

+SI

+SI

+SI

–SI

–SI

–SI

–SI

SHD

SHD

SHD

SHD

23126
Rev. A

SHD

JU1

JU2

JU3

JU4

100 K

100 K

100 K

I n d i c a t o r t e r m i n a l
location

FLOOR

LOAD CELL CABLE

STEEL COVER

Advertising
This manual is related to the following products: