RoughDeck BDP Installation/Operation Manual

13

Figure 6-3. Foot Pad - Side View

5. Route the load cell cables near each corner so that the cable is free from possible contact with each foot.

Hold the cable in position with the supplied adhesive-backed cable ties.

NOTE: Do not cut load cell cables. Coil the extra cable and slide it into the scale between the top and bottom plates. A
slot in the main channel is provided for this purpose.

6. After coiling excess cable, pass each individual end of load cell cable through its grommet in the

junction box cover (or through cable fittings in the NEMA 4X junction box).

NOTE: Corner correction trimming and calibration is necessary after load cell replacement. Follow instructions in
Sections 5.2 and 5.3.

6.3.1

Load Cell Wiring to Junction Box

The four load cells are each wired to their respective terminals in the junction box according to the corner

numbering system shown in Figure 6-4, and the coloring code in Table 6-2.
Pull excess cable out of the junction box enclosure and tighten the cable grips with a wrench. To be watertight,

the cable grips must be tightened to the point where the rubber sleeving begins to protrude out of the hub. Finally,

pull on each of the four cables to make sure that they do not slip.

Figure 6-4. Corner Numbering - Top View of Scale

.765

1

2

3

4