Assemble Deck Modules
5
15. If required, place and install any additional center modules in a similar manner.
16. Install the remaining end module on four setting blocks ensuring the end beams are aligned with and in
direct surface contact with the center module.
Figure 2-3. Module Installation
17. Center the module side-to-side and check that the end of the main beam is 3/4" from the end of the
concrete pit wall. Install and tighten the three top bolts on each beam (inside and outside) finger tight as in
the previous operation.
Do not install the bottom bolt at this time.
18. To reduce the on-site crane operating time, the manhole frame (shown in Figure 2-4 on page 5) can be
installed at this time. It is recommended to locate the frame in a central location close to the J box as shown
in Figure 2-5 on page 5.
Figure 2-4. Manhole Frame
Before installing the manhole frame, remove a section of the corrugation support bar in the location where the
manhole frame is to be installed. Additional manholes are available as options. Consult with local weights and
measures officials for any state restrictions or access in the state being installed.
OSHA may have restrictions on pit access. Consult with customer’s safety engineers for details.
Figure 2-5. Optimal Manhole Frame Location
Note
Manhole Frame
(24" square)
Note
Top View
To Scale House
Suggested Location of Manhole
Junction Box
Corrugation Support Bar
(remove material as needed
to install manhole frame)