Installation, Receiving inspection, Chapter 3 installation – B&C Technologies DE Series Commercial User Manual

Page 11

Advertising
background image

Chapter 3

Installation

3.1

Receiving Inspection

Upon receipt of the equipment, visually inspect for shipping damage and note any damage with
the carrier before signing the shipping receipt, or advise the carrier of the damage as soon as it is
noted.

If damage is discovered, a written claim must be filed with the carrier as soon as possible.

Note: Warranty is VOID unless the equipment is installed according to instructions. The installa-
tion must comply with the minimum requirements listed in this manual. All national, state and
local codes must be followed including but not limited to gas, electrical, plumbing and HVAC.
Due to various requirements, statutory codes should be well understood before installation com-
mences.

Important: The dryer should be transported and handled in an upright position.

8

Advertising