Cisco 4490 User Manual

Page 63

Advertising
background image

3-17

Cisco Global Site Selector 4490 Hardware Installation Guide

78-15755-01

Chapter 3 Installing the Cisco Global Site Selector 4490

Removing or Replacing a Cisco Global Site Selector 4490

Removing or Replacing a Cisco Global Site
Selector 4490

Warning

Before working on a GSS, turn OFF the power and unplug the power cord.

Warning

Ultimate disposal of this product should be handled according to all national
laws and regulations.

Before physically removing or replacing a GSS, use the primary GSSM GUI to
logically remove the GSS from the network. You may need to logically remove a
GSS from your network when you:

Move a GSS device between GSS networks

Remove or replace a GSS or standby GSSM

Send the GSS or standby GSSM out for repair or replacement

For details about using the primary GSSM GUI to logically remove a GSS device
or the standby GSSM from the GSS network, refer to Chapter 1, Managing GSS
Devices from the GUI, in the Cisco Global Site Selector Administration Guide.

Note

Do not logically remove the primary GSSM from the GSS network. If you need
to physically take the primary GSSM offline for either maintenance or repair,
temporarily switch the roles of the primary and standby GSSMs as outlined in the
Cisco Global Site Selector Administration Guide.

Power

Green

On

Indicates that the GSS 4490 has power.

Flashing

Indicates that the GSS 4490 is in standby mode.

Table 3-1

Front Panel LEDs (continued)

LED

Color

State

Description

Advertising