Step 4

Initiate a heat call from the room thermostat and verify that the system recognizes the heat call. Refer
to the Operating Status section (Page 1.02) for more information on the various heat call status displays.
The supply air blower should operate. In an application interfacing the system with an air conditioner or
heat pump, verify that this device is operating appropriately.

Step 5

Initiate a cooling call from the room thermostat, if applicable, and verify that the system recognizes the
“COOL” call. The supply air blower should operate. In an application interfacing the system with an air
conditioner or heat pump, verify that this device is operating appropriately.

Step 6

Press the up arrow until the targeted brick core charge level is displayed on the control panel. With the
system in an off-peak (charge) mode, initiate a charge control override. (See Page 1.03.) Once initi-
ated, the target level of the system should be 100 percent and the control panel should display “tL: F”.
All of the elements should be energized.

Step 7

With all heating elements operating, disconnect the orange/black wire located at the air outlet, above the
damper assembly of each Storage Module. When this wire is disconnected, all heating elements of that
Storage Module should turn off. Repeat this step on the second Storage Module (if equipped).

Ensuring that all heating elements turn off when the core limit(s) open is important.
Make sure Step 7 of the Installer’s Final Check-Out Procedure is completed.

Step 8

With an amp meter, verify that the amperage of the system is correct for the installation. Refer to the
System Identification Label on the heating system for information regarding the proper amperage.

Step 9

Cancel the charge control override and verify that all elements in the system de-energize. Refer to the
Charge Control Override section (Page 1.03) for instructions on canceling the charge control override.

Step 10 Verify, once again, that the Operating Mode displayed on the control panel corresponds with the power

company's peak control signal.

Step 11 In applications utilizing the Steffes Power Line Carrier control system, complete the Installer’s Final

Check-Out Procedure in the Owner’s and Installer’s Manual provided with that device.

Step 12 Complete the manufacturer's warranty card and return promptly.

T

HERM

E

LECT

I

NSTALLATION

„

3.14

Step 1

Verify that the operating mode displayed on the
control panel corresponds with the power
company's peak control signal. Refer to the Operat-
ing Status section (Page 1.02) for more information on the proper
operating mode.

Step 2

Press the up arrow one time and verify that the
outdoor temperature information displayed on the
control panel is approximately the same as the current outdoor
temperature. Refer to the Operating Status section (Page 1.02) for
more information on the outdoor temperature display.

Step 3

Press the up arrow again and the current heat call
status will be displayed on the control panel. Refer
to the Operating Status section (Page 1.02) for
more information on the heat call status display.

INSTALLER'S FINAL CHECK-OUT PROCEDURE

HAZARDOUS VOLTAGE:
Risk of electric shock,
injury, or death. System
may be connected to
more than one branch
circuit. Disconnect
power to all circuits
before servicing. Equip-
ment must be serviced
by a qualified technician.

WARNING

Installation

Advertising
This manual is related to the following products: