INSTALLING THROUGH A FRAME WALL

NOTE: The WOW25 models will install between wall studs on 16” centers. The WOW40 will attach to a stud

on either the right or left side. The opposite stud must be cut out of the opening and 1-1/2” below the cutout. You

must then install a 2”-by your wall thickness plate on top of the cut stud and secure to the remaining stud. This plate

will cover the opening inside the wall, front to back, and provides support as well as a foundation that will be used

to secure the bottom of the heater.
A.)

At desired height, mark hole opening for your

model heater. (See Figure 11).

B.)

Before cutting, verify both inside and outside

clearances. Verify that no electrical wires, con-

duit, water or gas pipes pass through the area

you have marked.

C.)

Cut out marked hole location. Make sure that

the cut out opening is level inside to outside.

D.)

Remove six (6) screws from back of heater

which secure back of outer cabinet to intake

and exhaust tube flanges. Save screws. (See

Figure 5).

E.)

Gently slide combustion tube assembly for-

ward and out of outer cabinet. (See Figure 6).

F.)

From inside the room, slide outer cabinet

through cut out opening until flanges are flush

against inside wall. (See Figure 12).

FIGURE 12

WOW 25

WALL
STUD

WOW 40

WALL

STUD

One stud
must be
cut

M u s t
install
b a s e
plate

G.)

Secure in place through side of cabinet into

stud. WOW253/254 will be secured into

studs on both sides. WOW403/404 must

be secured to stud on one side, can be left

or right side. (See Figure 12).

H.)

From outside secure the two support brack-

ets to the outside wall, anchors (not provided)

may be required. Make sure brackets are

flush against the outer cabinet bottom and un-

der the left and right sides. You must drill four

7/64” holes through the outer cabinet bottom

using clearance holes in the support bracket

as a template. Secure brackets to outer

cabinet bottom using four #8x1/2” screws

provided. See Figure 21.

I.)

Gently slide combustion tube assembly back

into outer cabinet. Check to make sure the

gaskets on the intake and exhaust tube

flanges are in place and unbroken. Flanges

must be flush against back of outer cabinet.

From outside, secure back of outer cabinet

to air intake and exhaust flanges with the

six (6) screws removed in step D.

J.)

Locate factory installed thermostat wires

extending from the front of heater. Connect

24 V. wall thermostat (provided) and a maxi-

mum 20’ of thermostat wire. Do not splice

thermostat wire. (See Figure 9).

K.)

Connect 3/8” minimum gas supply line to

heater. (See Figure 4).

L.)

Plug factory wired power cord into a properly

grounded 115 volt electrical outlet. Never use

an extension cord. If homeowner desires,

heater may be hard wired by a licensed electri-

cian (check your local electrical codes).

M.)

Turn gas supply on. Check all connections

for leaks using a soapy solution. NEVER

check for leaks with an open flame.

N.)

Install front panel. Hang top of front panel

over top outer cabinet flange and between

wall. Secure using four (4) #8 x 1/2 painted

screws (provided). (See figure 10).

O.)

From outside, caulk between cabinet and wall

opening. Installation is now complete. Follow

lighting instructions to put heater in operation.

During initial warm-up heater may smoke

slightly, so provision should be made for ad-

equate ventilation.

M u s t
install
b a s e
plate

FIGURE 11

17 1/4”

A.) WOW40 - 25-1/8”
A.) WOW25 - 14-3/8”