Brookfield DV-III Ultra Rheometer User Manual

Page 12

Advertising
background image

Brookfield Engineering Laboratories, Inc.

Page 12

Manual No. M98-211-E0912

1) Place the upright rod into the hole at the front of the base. The rack gear and clamp assembly

should face the rear of the base (see Figure I-4). The upright rod (item #1) is held in place

with the jam nut (item #4) which is attached from the bottom of the base. Tighten this nut

with a suitable wrench (spanner).

DV-III Ultra Stand Assembly

CLAMP ASSEMBLY
NOTE: “FRONT” FACES TOWARD YOU.

DV-III Ultra
HEAD UNIT

TENSION SCREW

2

1

3

4

5

Figure I-4

Advertising