Brookfield DV-III Ultra Rheometer User Manual

Page 84

Advertising
background image

Brookfield Engineering Laboratories, Inc.

Page 84

Manual No. M/98-211-B0104

Brookfield Engineering Laboratories, Inc.

Page 84

Manual No. M98-211-E0912

When the test is allowed to run to completion, one of the following screens (Figures IV-78 through

IV-81) are displayed:
Figure IV-78 is displayed when the yield test passes. The % torque and stress (in Pa) at the point

of yield are displayed along with the temperature (in °C) at the conclusion of test.

#5: Sample Tst S:71

TEST COMPLETE

%=73.56 TEMP=025.5

YIELD=0726.4 Pa

Figure IV-78

Figure IV-79 is displayed when the yield test fails due to an over-range error.

#5: Sample Tst S:71

YIELD ERROR

OVER-RANGE

PRESS ESC OR ENTER

Figure IV-79

Figure IV-80 is displayed when the yield test fails due to an under-range error.

#5: Sample Tst S:71

YIELD ERROR
UNDER-RANGE

PRESS ESC OR ENTER

Figure IV-80

Figure IV-81 is displayed when the yield test fails due to the resultant yield stress exceeding the

user defined limits. The actual yield stress measured during the test is displayed in the first field to

the right of the "Yield=", while the limiting value causing the failed test (high or low yield stress)

is displayed in the second field.

#5: Sample Tst S:71

LIMIT ERROR

YIELD=726.436 (200.0)

PRESS ESC OR ENTER

Figure IV-81

After screens IV-78 through IV-81 are displayed, pressing the MOtOr ON/OFF/eSC key returns

the screen to Figure IV-70. At this point, after ensuring the appropriate spindle is attached, the

eNter

key can be pressed to run the test again. Pressing the eNter key when any of these screens

is displayed immediately runs the test again and displays the first appropriate Run screen (Figure

IV-72 through IV-75). When the test is complete, the results are sent out of both the parallel and

serial (RS-232) ports.

Advertising