BUCHI SpeedDigester K-439 User Manual

Page 39

Advertising
background image

6 Operation

39

K-439 Operation Manual, Version A

6 .7 .3

Installing a suction module and sample tubes (300 ml)

To withdraw hazardous fumes and vapors a suction module must be installed.

Prerequisites:
All hoses and connectors must be unclogged.

Installation steps:
For installation and handling all parts must be < 40 °C!

Install the plastic adapter piece to the suction module

1.

Mount the hose connector at the EPDM hose

2 of the suction module (i.e. Scrubber B-414 or

water jet pump).
The connector at the EPDM hose can be stored temporarily at the magnetic bracket at the rear

side of the SpeedDigester.

1

2

Rear side

Front side

Insert the prepared sample tubes into the rack(s) — start with the first (front) position.

When the digestion session does not require a full set of samples, then fit unused positions with a

glass cap to seal the suction circuit!

Advertising