Rules for first-time start-up, Instructions for operating the furnace, Installation site requirements – BUCHI DuMaster D-480 User Manual

Page 107: O_4289, O_508, O_3657

Advertising
background image

Operation Manual D-480

©BÜCH Labortechnik AG

6 - Starting up and shutting down the instrument

107

Rules for first-time start-up

First-time start-up

Observe the following rules for first-time start-up.

First-time start-up is performed by a trained service technician. Only the service technician may
open the transport packaging. If the customer opens the transport packaging, this results in loss
of warranty.

Make sure that the user is completely available for instruction and hand-over of the equipment at
the time of first-time start-up. If additional instruction by our service technician is required, this
must be billed separately.

If you do not order the PC and peripherals from BÜCHI, BÜCHI reserves the right to perform
start-up with their own equipment. Any modifications of the analyzer must be performed by the
customer.

The instrument is installed by a trained service technician, demonstrating performance with
analyses of max. 10 standard measurments.

For special analysis problems, BÜCHI's application laboratory will draw up specific work
instructions at the customers request and against payment.

Requirements for installing the instrument software

In order to install the software correctly, administrator rights for the PC must be available.

Conditions for operating the instrument software

Do the following to be able to operate the software without any problems:

On the PC where the software is installed, check power management settings under Control
Panel > Power Management
or under Control Panel > Power Options. The following options
must be set to "Never":

"Turn off monitor"

"Turn off hard disks"

"System stand by"

"System hibernates"

Power management must also be disabled in the PC's BIOS.

The PC on which the software is installed must not be overloaded with other software. This could
cause unstable operation of the software.

Instructions for operating the furnace

Note

Observe the instructions for using the furnace so that the warranty is upheld. Further details can be
found under Warranty on the furnace.

Installation site requirements

General requirements

Observe the general installation site requirements:

The analyzer must not be installed in areas with explosive atmosphere (in accordance with the
ATEX guideline).

Good ventilation.