2 electrical connections, 3 condensers, Electrical connections – BUCHI Extraction Unit E-816 HE User Manual

Page 22

Advertising
background image

5 Putting into operation

22

E-812/816 Hot Extraction Operation Manual, Version B

5 .2

Electrical connections

NOTE
External connections and extension lines must be provided with a grounded conductor lead (3-pole
couplings, cord or plug equipment). All used power cords must meet the input power requirements.

NOTICE

Risk of instrument damage by wrong mains supply.
• External mains supply must meet the voltage given on the type plate
• Check for sufficient grounding

5 .3 Condensers

To install the glass condensers proceed as follows:
• Dip your fingertip into distilled water and run over the black O-ring of the receiving funnel. Make

sure that no water drops remain in the funnel.

• Carefully put the condenser into the receiving funnel.

Fig. 5.1: Installing the glass components

Advertising
This manual is related to the following products: