CT-500/600 Series II CONSTANT TEMPERATURE BATH
Version 3..2—March, 2007;
CANNON
CANNON
CANNON
CANNON
CANNON
®
Instrument Company
2139 High Tech Road • State College, PA • 16803 • USA
14. Loosely install the front
housing using the screws
previously removed, but do
not yet tighten the screws.
15. Install the rear housing by
sliding the front flanges
forward under the front
housing until the two pieces
mate. If there is insufficient
play, loosen the front housing
screws until the flanges can
slide into place.
16. Secure the rear housing
using the two screws
previously removed (see
Figure 5h, below).
17. Obtain two additional screws
and toothed washers from
the Accessories Kit. Install
the screws to the tabs at the
rear of the front housing to
secure the housing to the
vertical channel.
18. Tighten all housing screws to
complete the housing
installation.
Figure 5d: TE cooler mounting tabs
Figure 5e: Securing mounting tabs
Figure 5h: Installing rear housing
Figure 5f: Connecting TE power
Figure 5g: Connecting power