Getting started, Unpack and inspect, Table 4 — packing list (tesc system) – Cannon Instrument TESC User Manual

Page 13: Tesc operator's manual, rev 1.0

Advertising
background image

7

CANNON®

TESC Operator's Manual, Rev 1.0

Getting Started

Unpack and inspect

Unpack and inspect the complete CANNON® Thermoelectric Sample Conditioner System and
all accessories as soon as they are received.

Caution:

Many components are fragile. Use caution when moving and

handling the TESC System and accessories.

1. Carefully unpack the entire contents of the shipment.
2. Referring to the packaging list, verify that all materials were received.
3. Inspect materials for defects and shipping damage. Contact your CANNON®

representative to resolve any issues.

Table 4 — Packing list (TESC System)

Description

Part Number

TESC base unit

17.5075

Mounting collar

17.5113

Retaining ring

17.5114

Retaining screws (4)

01.0063

MAINS AC power cable

74.2110 (US standard)

MAINS AC pass-through power cable

17.4168

RS-485 to USB cable

17.5122

Brookfield® DV2T viscometer

115 V

AC

: 17.5126; 230 V

AC

:

17.5127

Brookfield® #4B2 insulated spindle

17.5128

Brookfield® EZ-Lock spindle coupling

17.5129

Advertising