5 | compressor assembly – GEA Bock HGZ7 User Manual

Page 19

Advertising
background image

D
GB
F
E

19

09726-11.2014-DGbF

5| Compressor assembly

5.8 Laying suction and pressure lines

5.7 Pipes

Pipes and system components must be clean and dry inside and free of scale, swarf and layers of

rust and phosphate. Only use air-tight parts.

Lay pipes correctly. Suitable vibration compensators must be provided to prevent pipes being

cracked and broken by severe vibrations.

Ensure a proper oil return.
Keep pressure losses to an absolute minimum.

Fig. 24

A rule of thumb: Always lay the first pipe section starting from the shut-off valve downwards
and parallel to the drive shaft.

ATTENTION Improperly installed pipes can cause cracks and tears, the result

being a loss of refrigerant.

INFO

Proper layout of the suction and discharge lines directly after
the compressor is integral to the system’s smooth running and
vibration behaviour.

Rigid
fixed point

As short as
possible