6| Commissioning

As changing the shaft seal involves opening the refrigerant circuit, this is recommended only if the
seal is losing refrigerant. Replacing the shaft seal is described in the spare part kit concerned.

6.7 Shaft seal change

6.8 Start-up

WARNING! Ensure that both shut-off valves are open before starting

the compressor!

Check that the safety and protection devices (pressure switch, motor protection, electrical

contact protection measures, etc.) are all functioning properly.

Switch on the compressor and allow to run for a minimum of 10 min.
Check the oil level

by: The oil must be visible in the sightglass.

ATTENTION! If larger quantities of oil have to be topped up, there is a risk of oil

hammer effects. If this is the case check the oil return!

6.9 Avoiding slugging

ATTENTION! Slugging can damage the compressor and cause

coolant to leak.

To prevent slugging:

The complete refrigeration system must be properly designed.
All components must be compatibly rated with each other with regard to output

(particularly the evaporator and expansion valves).

Suction gas superheat at the compressor input

should be min. 7 - 10 K. (check the setting

of the expansion valve).

The system must reach a state of equilibrium.
Particularly in critical systems (e.g. several evaporator points), measures are recommended such

as replacement of liquid traps, solenoid valve in the liquid line, etc.
There should be no movement of coolant whatsoever while the compressor is at