HI HLPRC03 SERIES LOAD POINT ASSEMBLY

Page 2

LOAD SENSOR CERTIFICATION SHEETS ARE
AVAILABLE 24 HOURS A DAY AT OUR WEB-
SITE: http://www.hardinst.com. Go to “Products” or
“Support,” click Advantage Load Sensor Tool/Certi-
fication, then follow directions.

Note the serial number(s) for reference when talking
to Hardy Customer Service. Store this information in
a safe location for future reference.

Site Preparation

As foundations for the load point assemblies, use a
metal base plate that will not be deformed when you
weld it to the bottom plate of the load point.

Check the I/I diagrams that come with this docu-
ment for the assembly’s dimensions. (They are
also available on the Hardy Instruments Web Site
(http://www.hardyinst.com ).

All mounting surfaces for the base and loading
plate must be level. Load Point Assemblies must
be level to within 0.4/100 for legal or trade appli-
cations or 0.8/100 for general applications.

Complete all welding before installing the load
sensor.

Basic Engineering
Principles for
Positioning Load
Point Assemblies

Note the following requirements when positioning the
Load Point.

Position the Load Point Assemblies to distribute
the load (weight) as evenly as possible between
each load point assembly in the scale.

When the installation does not allow even load
distribution, select higher capacity load point
assemblies.

All load point assemblies must have the same
capacity when used in one scale.