CHAPTER 7: MAINTENANCE

Page

88 of 162 PR2: 05/09/12

Benchmark 1.5LN Dual-Fuel Low NOx Boiler

Operation and Maintenance Manual

OMM-0041_0C

GF-121

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288

Figure 7-5: External Condensate Trap: Older Style (Left) and Newer Style (Right)

7.8 SHUTTING THE BOILER DOWN FOR AN EXTENDED PERIOD OF

TIME

If the boiler is to be taken out of service for an extended period of time (one year or more), the

following instructions must be followed.

1. Set

ON/OFF switch on the front panel to the OFF position to shut down the boiler’s

operating controls.

2. Disconnect AC power from the unit.
3. Close the water supply and return valves to isolate boiler.
4. Close external gas supply valve.
5. Open relief valve to vent water pressure.

7.9 PLACING THE BOILER BACK IN SERVICE AFTER A PROLONGED

SHUTDOWN

After a prolonged shutdown (one year or more), the following procedures must be followed:

1. Review installation requirements included in Chapter 2.
2. Inspect all piping and connections to the unit.
3. Inspect exhaust vent, air duct (if applicable).
4. Perform initial startup per Chapter 4.
5. Perform safety device testing and scheduled maintenance procedures per Chapters 6 and

7 of this manual.