INITIAL START-UP

1.

Keep the permeate water line to drain for this procedure.

2.

Fully open the concentrate valve (Counter Clockwise). (Figure 1B, Page. 16)

3.

Fully close the recycle valve (Clockwise)(If Applicable). (Figure 1B, Page. 16)

4.

Adjust the throttle valve at 50% open (Counter Clockwise). (Figure 1D, Page. 17)

5.

Turn the RO system on and adjust the concentrate (waste) valve, recycle valve (If Applicable), and

the throttle valve to the designed flow and pressure. (Figure 1B, Page. 16)

6.

Inspect the system for leaks.

7.

Allow the system to run 30 minutes to flush the preservative solution from the system.

8.

After 30 minutes, shut down the system.

9.

Re-direct the permeate water back to the tank and then turn the system back on.

10. Record the readings daily for a week; after one week record the readings once a week.