Cooper Lighting S260-75-1 User Manual

Page 7

Advertising
background image

S260-75-1

7

!

SAFETY

FOR LIFE

SOURCE I

SOURCE II

LOAD

POTENTIAL
SENSING
TRANSFORMERS

POTENTIAL
SENSING
TRANSFORMERS

H.V.
SWITCH
II

H.V.
SWITCH
I

TYPE
S
CONTROL

Figure 2.
Typical Type S control load-transfer scheme.

11"

13 1/2"

1 3/16"

22 5/32"

12 13/16"

8"

16"

5/8" HOLE PROVIDED
FOR CUSTOMER LOCK

MTG HOLES (2) FOR
5/8" MAX BOLT DIA

1 1/2"

20 1/8"
MTG DIM

17 7/8"

GROUNDING
TERMINAL LUG
(14 TO 4 STRANDED)

1 5/8" DIA HOLES

2 1/2" 2 1/2"

2 1/2" 2 1/2"

5 1/4"

1 1/2"

1 1/2"

STD CONTROL

CONTROL WITH FAULT BLOCK

Figure 3.
Outline and mounting dimensions.

Direction of

Transfer

First Switch

Transition

(Source to

Switch

Reaction Time*

Time**

Source)

Type of Transition

VR, VLR, VRV (standard)

2.5 to 3.5 cycles 10 sec (approx)

I to II

No paralleling of sources

VR, VLR, VRV (standard)

2.5 to 3.5 cycles 10 sec (approx)

II to I

No paralleling of sources

VR, VLR, VRV (standard)

10 sec (approx)

1.0 to 1.5 cycles

II to I

Paralleling of sources on return to preferred source

VR, VLR, VRV (quick close) 2.5 to 3.5 cycles 6 to 7 cycles

I to II

No paralleling of sources

VR, VLR, VRV (quick close) 2.5 to 3.5 cycles 6 to 7 cycles

II to I

No paralleling of sources

VR, VLR, VRV (quick close) 4.0 to 5.5 cycles 1.0 to 1.5 cycles

II to I

Paralleling of sources on return to preferred source

TSC

7 to 8 sec

7 to 8 sec

I to II

No paralleling of sources

TSC

7 to 8 sec

7 to 8 sec

II to I

No paralleling of sources

TSC

7 to 8 sec

7 to 8 sec

II to I

Paralleling of sources on return to preferred source

PST-6, PST-9

2.0 to 3.0 cycles 5.0 to 6.0 cycles

I to II

No paralleling of sources

PST-6, PST-9

2.0 to 3.0 cycles 5.0 to 6.0 cycles

II to I

No paralleling of sources

PST-6, PST-9

5.0 to 6.0 cycles 2.0 to 3.0 cycles

II to I

Paralleling of sources on return to preferred source

TABLE 1
Reaction and Transition Times of Cooper Power Systems Motor-Operated Switches

*

Time from expiration of time delay to first opening (or closing) of high-voltage switch. Add approximately one cycle to the
values shown to allow for Type S control relay operating time.

** Time-load tap is disconnected or paralleled depending on type of transition used.

Advertising