Geberit tessera, Tank & carrier installation – Chicago Faucets Plumbing Product User Manual

Page 4

Advertising
background image

4

Geberit Tessera

TM

Toilet System

Installation & Maintenance Instructions

F. F.

R. H.

RH = X plus 3"

3"(75)

3"(75)

x

12" to 16"

(305-407)

TANK & CARRIER INSTALLATION

IMPORTANT! The finished Rim Height (RH) for the bowl must be determined prior to installing the carrier.
Please take into account the seat height for final height dimensions.
NOTE: When determining X include the dimension for the finished floor covering.

1

2

The 2 x 6 framework must be secured firmly to the
floor and ceiling for proper installation. Locate the
supporting studs and reinforce with additional nails
or screws.

Make sure rough opening(s) are properly plumbed
and square.

3

1. Ensure that the carrier has been set to RH specification.

2. Cut opening through sole plate and floor to clear passage for

discharge fitting at required location.

3. Place the carrier assembly in the prepared opening.

4. THE CARRIER FRAME MUST BE FLUSH WITH THE

FRONT OF THE SUPPORTING STUDS to provide maxi-
mum support for the wall surface material (applied later).

5. Mark the 6 anchor hole locations on the sole plate and the

6 bolt hole location (3 each side) on the studs.

6. Remove the carrier assembly from the studs.

7. Drill six (6) 3/16” pilot holes into the sole plate, drill six (6)

5/16” bolt holes into the studs where marked.

8. Install tank & carrier unit into the frame work and secure

with hardware as provided.

9. Connect discharge fitting to 3” DWV drain pipe in vertically

position with coupling and stainless hose clamps as provi
ded. (DO NOT CUT OR MODIFY DISCHARGE FITTING)
Any modification to the discharge fitting will result in loss of
bowl siphon.

Reinforce with additional
nails or screw

3

/

16

"

5

/

16

"

5

/

16

"

Advertising