Checklists, It] pre-test checklist, Iti operation checklist – GE PHP900SMSS User Manual

Page 10: Installation instructions

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation Instructions

CHECKLISTS

IT] PRE-TEST CHECKLIST

H Remove all protective film, if present, and any

stickers.

E Check to be sure that all wiring is secure and

not pinched or in contact with moving parts.

E Check level of appliance.

E Check that the cooktop is properly grounded.

ITI OPERATION CHECKLIST

E Remove all items from the top

of the cooktop surface.

E Turn on the power to the cooktop.

(Refer to your Owner's Manual.) Verify that all
surface burners operate properly.

Check that the circuit breaker is not tripped
nor the house fuse blown.

E

E

E See Owner's Manual fortroubleshooting list.

Check that conduit is securely connected to
thejunction box.

NOTE TO ELECTRICIAN:

The power leads supplied with this appliance are

UL recognized for connections to larger gauge
household wiring. The insulation of these leads
is rated at temperatures much higher than

the temperature rating of household wiring.
The current carrying capacity of a conductor

is governed by the wire gauge and also the

temperature rating of the insulation around
the wire.

NOTE: ALUMINUM WIRING

• WARNING:

IMPROPER CONNECTION OF ALUMINUM
HOUSE WIRING TO THE COPPER LEADS CAN
RESULT IN A SERIOUS PROBLEM.

• Splice copper wires to aluminum wiring

using special connectors designed and UL
approved forjoining copper to aluminum
and follow the manufacturer's recommended
connector procedure closely.

NOTE: Wire used, location and enclosure of

splices, etc., must conform to good wiring
practice and local codes.

10

Advertising
This manual is related to the following products: