Installing side burner kit – Kenmore 141.16223 User Manual

Page 14

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installing Side Burner Kit

1. Attach the Side Burner Gas Valve Assembly to the Side Burner Gas Valve Hole on the Side Burner

Frame. See lisiM Align the 2 holes on the Side Burner Frame with the threaded holes on the
Side Burner Gas Valve Bracket. Tighten securely using 2 screws and washers provided.

2. Cut Fastening Band from Pot Support and set Pot support aside. Install the Side Burner through

the top hole in Side Burner Frame and onto the Side Burner Gas Valve. Make sure that opening

at end of Side Burner Connection Tube goes over tip of Side Burner Gas Valve. Secure Side Burner

with supplied Cotter Pin. See

3

. Install the Control Knob to the Side Burner Gas Valve Stem. See E23

4. Connect the Electric Wire terminal from Side Burner with the other from Grill Head. See EQO

Bind the connected Electric Wires and Side Burner Connection Tube together using the supplied Fastening
Band.

5. The gap between the Side Burner Electrode Tip and the Side Burner Port should be approximately

1/8"-3/16". SeeEin ^he gap is wider than 3/16", use a pair of long nose pliers and gently

bend the Electrode Tip toward the burner.

6. Place the Side Burner Pot Support into the Side Burner Frame. See

7. Place the Side Burner Wind Shield on the Side Burner Frame. See

Advertising