Stardance direct vent/natural vent gas heater, Selkirk direct-temp metalbestos direct vent system – Vermont Casting SDDVT User Manual

Page 20

Advertising
background image

20

Stardance Direct Vent/Natural Vent Gas Heater

20012734

ST222

vent thru ceiling

12/99

#7DVAIS

Attic Insulation

Shield

#7DVFS

Firestop in

Upper Floor

#7DVFS

Firestop in

Ceiling

Use Four

8dNails

ST222

Fig. 31 Install firestops and attic insulation shield.

ST221

vent thru roof

12/99

Sealant

Storm Collar

Use three #5 sheet
metal screws at
each joint

Upper

edge of

flange

goes under

upper

shingles

Flashing

#7DVSKV

(A, B, or F)

RoofSupport

ST221

Fig. 32 Roof support and flashing.

Selkirk Direct-Temp Metalbestos Direct

Vent System

Installation Instructions
1. Determine whether the length of pipe fits the appli-

ance outlet by attempting to engage the parts. If the
parts engage smoothly, proceed to Step 2. If ob-
structions, interference or loose fit is noted, contact
the appliance manufacturer or Selkirk Metalbestos
with the dimensions of the appliance outlet.

2. Slide the length of pipe over the appliance outlet a

minimum of 1¹⁄₂” and screw to the appliance outlet
collar using a minimum of two (2) #8 x 1/4” sheet
metal screws.

Appliance Adapter (AAV)
The appliance adapter (AAV) adapts DIRECT-TEMP to
most direct vent appliances incorporating outlet collars
configured to receive most common 4” (ID) 6⁵⁄₈” (OD) or
5” (ID) by 8” (OD) “Twist Lock” Style, direct vent sys-
tems.
The adapter incorporates two (2) indentations on the
outer wall of the inlet end, which are designed to “Twist
Lock” into place upon attachment to the appliance
outlet. Align the adapter indentations with the entry
slots of the appliance outlet and slide together. Turn the
adapter clockwise approximately one-quarter turn to
lock in place. The outlet end of the adapter is standard
DIRECT-TEMP construction.

Framing Dimension Table 1

Model DT Ceiling Support (CS) Cathedral Ceiling Wall Thimble

Diameter

Firestop (FS)

Support CCS)

(WT)

4”

8¹⁄₄” x 8¹⁄₄”

10⁵⁄₈” x 10⁵⁄₈”

8¹⁄₄” x 8¹⁄₄”

5”

10¹⁄₈” x 10¹⁄₈”

14¹⁄₂” x 14¹⁄₂”

10¹⁄₈” x 10¹⁄₈”

9. Install the storm collar and seal around the joints.

(Fig. 32)

10. Add additional vent lengths to achieve the proper

overall height.

11. Apply cement to the inner and outer termination col-

lars and install the terminal cap.

Use of Sealant
It is not required to apply or use sealant on the inner
liner of DIRECT-TEMP. For outer wall joint sealing
considerations, follow appliance manufacturer recom-
mendations.
Joint Connection:
The pipe and elbows are assembled by inserting the
outlet (male) end of a length of pipe or elbow into the in-
let (female) end of an adjacent length of pipe or elbow.
Make sure the outlet end is fully seated within the inlet
end of the adjoining section and the gasket, located on
the inner liner of the inlet section is fully enclosed by the
inner liner of the outlet of the adjoining section. Push
in the Lock Tab such that it becomes seated within the
inward groove of the adjoining section. This locks the
joint in place. (Fig. 33)

Advertising