Setup before installation, Check accessories, Open device – IC Realtime 2Mp Full HD 3x Network PTZ Dome Camera (ICIPP2000M4) User Manual

Page 9: About ceiling installation position map, 2 setup before installation, 1 check accessories, 2 open device, 3 about ceiling installation position map

Advertising
background image

2

2 SETUP BEFORE INSTALLATION

2.1 Check Accessories

Before the installation, please check the accessories one by one according to the packing list.

Please make sure all the components listed are included.

2.2 Open Device

Remove the package and then take out the device. Open the transparent cover and take out the

packing material

EPE

around the speed dome driver. Please remove the dustproof paster from

the pedestal. See Figure 2-1.

Figure 2-1

2.3 About Ceiling Installation Position Map

The ceiling installation position map is to define hard ceiling holes position and cable exit position.

The shadow part is the mechanical blind spot. Please paste it according to your actual

requirement to avoid mechanical blind spot. See Figure 2-2.

Advertising