Setup instructions, Save these instructions, Pool setup (continued) – Intex 12 FT X 30 IN METAL FRAME POOL 2013 User Manual

Page 11

Advertising
background image

(87PO) ROUND METAL FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 07/20/2012

87PO

SAVE THESE INSTRUCTIONS

Page 11

English

SETUP

INSTRUCTIONS

POOL SETUP (continued)

You may have purchased this pool with the Intex Krystal Clear™ filter pump. The pump has

its own separate set of installation instructions. First assemble your pool unit and then set up

the filter pump.

Estimated assembly time 30-60 minutes. (Note the assembly time is only approximate and

individual assembly experience may vary.)

1. Liner preparation

• Find a flat, level location that is free and clear of stones, branches or other sharp objects

that may puncture the pool liner or cause injury.

• Open the carton containing the liner, joints, legs, etc., very carefully as this carton can be

used to store the pool during the winter

months or when not in use.

• Take out the ground cloth

(10) (optional) and

spread it over the cleared area. Then take out

the liner

(7) and spread it out over the ground

cloth, with the drain valve directed towards

the draining area. Place the drain valve

away from the house. Allow the sun to warm

up the liner before inserting the beams

(6) into the sleeve openings.

IMPORTANT: Always set up the pool unit with at least 2 persons. Do not drag the

liner across the ground as this can cause liner damage and pool leakage (see

drawing 1).

• During the setup of this pool liner, point the hose connections or openings in the

direction of the electric power source. The outer edge of the pool should be within reach

of the pump’s electrical connection.

2. Frame assembly

• The frame pool’s legs

(8) and beams (6) fall into two groups. The larger diameters are the

horizontal beams that are slid (pushed) into the sleeve openings at the top of the

liner. The smaller diameters are the vertical legs. Both these legs and beams fit into the

T-joints

(3).

• Starting at any location, but always working in the

same direction, push the horizontal beam into the

sleeve. Once the beam is centered take one of the

T- joints and using the connection pin

(1), attach the

joint to one end of the beam by inserting the pin

through the seal

(2) and in the pre-drilled holes.

Repeat this procedure in a circular fashion until all

the beams and joints have been connected

(see drawing 2.1).

The last joint connection may be difficult to

complete. You can do it though, if you first

simultaneously raisethe last joint and beam

about 2 inches (5 cm). Now insert the beam into

the joint while lowering the pieces into position.

The beam will easily slide into the joint (see

drawing 2.2). Ensure that the last joint is fully

connected before proceeding to connecting

the legs.

1

7

1

2

6

3

2.1

2.2

3

Advertising
This manual is related to the following products: