Ss ee tt uu pp ii nn ss tt rr uu cc tt iioo nn ss – Intex 18 FT 8 IN X 53 IN SEQUOIA SPIRIT POOL 2012 User Manual

Page 12

Advertising
background image

120

PO

SAVE THESE INSTRUCTIONS

Page 12

(120PO) SEQUOIA SPIRIT

®

WOOD-GRAIN FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 10/06/2011

English

2. Clear the installation area

• Remove all grass, stones and sticks from marked area. Also remove center stake and

string.

3. Leveling

• Establish lowest point in pool area. Level entire pool site by digging or scraping away

uneven areas to the level of the lowest point. Always remove material from the top of
the slope rather than filling in the bottom
to ensure greater ground stability and
firmness. When all the areas are level and when excess ground is removed, you may fill
any small low areas which are left to level (with fined dirt). Always compact and level
ground afterwards (see drawing 2.1).

• Use a large mason rule (aluminum or wood) and a level. Level out the ground by cutting

rectangles (or squares), locating this rule in the selected and cleaned area (see
drawing 2.2).

4. Finishing

• On the cleaned and leveled ground, spread a light coat of sieved dirt to a maximum

depth of 1/2 inch (1 cm). Spray water and compact it (with a garden roller). Double
check and ensure it is well leveled. The ground has to be perfectly level in order to
proceed further.

SS

EE

TT

UU

PP

II

NN

SS

TT

RR

UU

CC

TT

IIOO

NN

SS

POOL SETUP (continued)

A

A

B

Always remove material from the top of the
slope rather than filling in the bottom.

Do not add

Remove

Remove

Unacceptable
Grade

Acceptable
Grade

2.1

2.2

Advertising