Ss ee tt uu pp ii nn ss tt rr uu cc tt iioo nn ss – Intex 18 FT 8 IN X 53 IN SEQUOIA SPIRIT POOL 2012 User Manual

Page 17

Advertising
background image

120

PO

SAVE THESE INSTRUCTIONS

Page 17

(120PO) SEQUOIA SPIRIT

®

WOOD-GRAIN FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 10/06/2011

English

SS

EE

TT

UU

PP

II

NN

SS

TT

RR

UU

CC

TT

IIOO

NN

SS

POOL ENCLOSURE SETUP (continued)

3. Support post installation

• Remove the cardboard inserts from the both slides of each support post.
• Insert the support post (17) into the bottom cap (25). Lift up the support post slightly to

let the slot on the upper end of the support post hook onto the ridge at the top clamp.
Push downward to ensure the support post is connected firmly with the top clamp and
inserted in the bottom cap (see drawings 10.1, 10.2 & 10.3).

• Repeat these procedures until all the support posts are joined to the top clamps and

bottom caps (see drawing 10.4).

4. Side panel installation

The number of the side panels depends of the size of your pool. There are two side panels
which need special attention during installation: First, the side panel which needs to be
installed outside the pool inlet & outlet holes, and second, the side panel with the warning
panel which needs to be installed in a location that the warning display is easily seen by
pool users before entering the pool. The side boards for these two special panels are
wrapped separately from others.

10.1

10.2

10.3

10.4

Advertising