Ss ee tt uu pp ii nn ss tt rr uu cc tt iioo nn ss – Intex 18 FT 8 IN X 53 IN SEQUOIA SPIRIT POOL 2012 User Manual

Page 16

Advertising
background image

120

PO

SAVE THESE INSTRUCTIONS

Page 16

(120PO) SEQUOIA SPIRIT

®

WOOD-GRAIN FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 10/06/2011

English

SS

EE

TT

UU

PP

II

NN

SS

TT

RR

UU

CC

TT

IIOO

NN

SS

POOL ENCLOSURE SETUP

Once the pool has been filled with water, and it has been confirmed that it is completely level
and that all vertical legs are positioned in the middle of each patio block, proceed with the
assembly of the pool enclosure.

1. Top clamp installation

• Fasten a top clamp (16) to the T-joint of the pool frame from the underneath. Ensure the

two bolts on top clamp are facing upward. Repeat the procedure until all the top clamps
are fastened to the T joints of the pool frame (see drawings 8.1 & 8.2).

2. Bottom cap and bottom rail installation

• Place a bottom cap (25) on the ground and align it with the leg cap. Ensure that the

threaded side hole in the bottom cap is facing outward. Place all bottom caps in position.

• Starting at any location, but always working in the same direction, connect a bottom

rail (24) in between two bottom caps (25). Ensure the pre-drilled holes on the bottom rail
hook through the knobs on the bottom cap. Repeat this procedure in a circular fashion
until all the bottom rails and bottom caps have been connected. Adjust the distance of
the bottom cap to the leg cap by estimating that the support post (17) will stand vertical
after it is installed (see drawings 9.1 & 9.2).

8.1

8.2

9.1

9.2

Advertising