2 unpacking / installation – KERN & SOHN GAB 30K-3PM User Manual

Page 15

Advertising
background image

6.2 Unpacking / installation

Carefully remove the balance from the packaging, remove plastic cover and setup
balance at the intended workstation.

Make sure that all transport locking devices are removed


To release the transport lock unscrew the transport screw

1 – non verifiable models or
2 –verifiable models


counter-clockwise.


For transportation carefully screw-in transport screw clockwise till to the stopper
and then fix it using locknut.

GAB-P-BA-e-1411

15

Advertising
This manual is related to the following products: