6 installation instruction for balance, Installation instruction for balance – KERN & SOHN OEX User Manual

Page 9

Advertising
background image

6

Installation instruction for balance

• Prepare the installation site for the OEX balance in a professional manner.

• Ensure that the installation site is dry, level and firm.

• The permissible operating temperate range is from -10°C to +40°C

• The floor base for the installation of the platform balance must be firm enough

for supporting the maximum weight allowed for the load plus the platform
balance.

• Balances of the OEX series without tripod have a display unit that can be

connected to the wall via a cable with the help of a holder.

• The display unit is designed for attachment to a table or for installation on a

wall with the help of a holder.

o

Unpack the balance outside the hazardous area.

o

Remove all transport locking devices after unpacking:


o

Attach tripod to platform.

o

Feed excess cable into the tripod

.


o

Lift the weighing pan and remove the transport locking device.

Weighing cell conductor

Transport Securing

Tripod

Washer

Nut

Doc.No.OEX-BA-e-1411

9

Advertising