5 monitoring of test resources, 4 basic safety precautions, 2 personnel training – KERN & SOHN KFU 1500V30M User Manual

Page 6: 5 transport and storage, 1 testing upon acceptance, 2 packaging / return transport

Advertising
background image

6

KFU-IA-e-1211

3.5 Monitoring of Test Resources

In the framework of quality assurance the measuring-related properties of the
weighing system and, if applicable, the testing weight, must be checked regularly.
The responsible user must define a suitable interval as well as type and scope of this
test. Information is available on KERN’s home page (www.kern-sohn.com with regard
to the monitoring of balance test substances and the test weights required for the
weighing system. In KERN's accredited DKD calibration laboratory test weights and
weighing systems may be calibrated (return to the national standard) fast and at
moderate cost.

4 Basic Safety Precautions

4.1 Pay attention to the instructions in the Operation Manual

Carefully read this operation manual before setup and commissioning,
even if you are already familiar with KERN balances.

4.2 Personnel training

The appliance may only be operated and maintained by trained personnel.
The installation of the display unit is restricted to specialist staff possessing well
acquainted knowledge with the workings of weighing scales.

5 Transport and storage

5.1 Testing upon acceptance

When receiving the appliance, please check packaging immediately, and the
appliance itself when unpacking for possible visible damage.

5.2 Packaging / return transport

 Keep all parts of the original packaging for a possibly

required return.

 Only use original packaging for returning.
 Prior to dispatch disconnect all cables and remove

loose/mobile parts.

 Reattach possibly supplied transport securing devices.
 Secure all parts against slipping and damage.


Advertising