7 operation, 1 operation limits – KERN & SOHN KFU 1500V30M User Manual

Page 9

Advertising
background image

KFU-IA-e-1211

9

7 Operation


Information about

Mains connection

Mains is connected via the connection cable of the display unit.

Initial Commissioning

Connection of peripheral devices

Adjustment, linearization and verification

Only the complete balance can be verified, that means the U-weighing bridge
in connection with an appropriate display unit.

You will find the accurate operation in the operating instructions which are included in
the scope of delivery.

7.1 Operation limits

The U-weighing bridge is designed for an even distributed load.

Advertising