8 safety-conscious working, 9 monitoring of test resources, 10 testing upon acceptance – KERN & SOHN HCN 200K500IP User Manual

Page 17: 11 initial commissioning, 12 shutdown and storage

Advertising
background image

17

HCB_HCN-BA-e-1340

2.8 Safety-conscious working
• Do not stand under swinging loads, see chap. 5.1.

• Position the crane in a way that the load is lifted vertically.

• When working with the crane and suspended balance wear personal safety

equipment (helmet, safety shoes etc.).

2.9 Monitoring of Test Resources
In the framework of quality assurance the measuring-related properties of the
balance and, if applicable, the testing weight, must be checked regularly. The
responsible user must define a suitable interval as well as type and scope of this test.
Information is available on KERN’s home page (www.kern-sohn.com) with regard to
the monitoring of balance test substances and the test weights required for this. In
KERN’s accredited DKD calibration laboratory test weights and balances may be
calibrated (return to the national standard) fast and at moderate cost.

2.10 Testing upon acceptance
Inspect packaging immediately upon receipt and inspect device when unpacking, see
chap. 4.1. in the event of any evident damage.

2.11 Initial Commissioning
In order to obtain exact results with the electronic balances, your balance must have
reached the operating temperature (see warming up time chap. 1).
During this warming up time the balance must be connected to the power supply
(mains, accumulator or battery).
The accuracy of the balance depends on the local acceleration of gravity.
Strictly observe hints in chapter Adjustment.
For checking original dimensions, s. chap. 4.3


2.12 Shutdown and storage
• Remove suspended balance from crane and remove all attachment devices from

the suspended balance.

• Do not store suspended balance outdoors.

Advertising