KERN & SOHN HCN 200K500IP User Manual

Page 37

Advertising
background image

37

HCB_HCN-BA-e-1340

Regular maintenance:

Prior to each usage • Check for fault-free operation of the attachment devices
Initial start-up,
every

3 months or

definitely after

12 500 weighing

processes

• Check all dimensions, see checklist chap. 8.3
• Check the attachment device for wear and tear, such as e.g.

plastic deformation, mechanical damage (unevenness),
notches, striation, cracks, corrosion, thread damage and
torsions.

• Check safety fastening on the attachment device for faults

and fault-free operation.

• Remove balance from use immediately if a reading exceeds

the permitted deviation from the original reading (see
checklist, chap. 8.3) or any other fault is identified.

• All repairs and replacement parts (e.g. hook) must be

documented by the service partner (see list, chap. 9.2).

Every

12 months or

in any case after

50

000 weighings

• If the enhanced maintenance has to be carried out by

trained staff (KERN customer service). At this general
revision all load carrying parts must be checked for gaps
with magnetic powder

Every

10 years or

anyway after

500,000

weighings

• Replace the crane scales

entirely

Note
During the revision watch out for wear and tear according to the following drawings
(chap. 8.3).

Rejection criteria: Load suspension devices may no longer be used when e.g.

+

Deviations are identified during the inspections specified for servicing.

+

The type or load rating plate is missing.

+

Load suspension devices known to have been overloaded or subject to
other harmful influences may no longer be used and/or may be re-used only
after inspection.

Advertising
This manual is related to the following products: