NORAC UC4.5-BC-JD8A User Manual

Page 24

Advertising
background image



22

Figure 22: Hole under Floor Mat

Figure 23: Alternate Cab Exit for Cabling

The hole in the floor may be too small for the connector. In this situation the

cable can be routed out the back of the cab through an opening close to the

bottom of the rear, right window (Figure 23).

5. Connect P12/P6 on C10 to R12/R6 of C11.

6. Route C11 to the rear of the sprayer near the sprayer valve block. Run the cables along

the sprayer frame with the JD harness.

Figure 24: Cable Configurations: C03, C13, C17 and C70

7. Connect S3 on cable C13 to the 3-pin tower (T3) on C11.

8. Route the free end of C13 under the sprayer to the shuttle valve manifold. Unplug the load

sense jam valve connector (Figure 25) and plug in the tower connector from C13.
Connect the load sense jam valve connector to the free connector on C13.

Cab Exit

Advertising