NORAC UC4+BC+JD11 User Manual

Page 29

Advertising
background image



26

7. Install the 2 pin connectors from C03 in to each NORAC valve as shown in Figure 28. The

connectors are marked RIGHT UP, LEFT UP, RIGHT DOWN and LEFT DOWN. Cables
labeled with UP go on the same side as the hydraulic hoses.

Figure 28: Valve Block Connections

8. Connect the six pin shroud (T6B) on cable C17 to the mating tower on the valve

extension cable (C11).

9. Connect the three pin tower (T3) on cable C17 to the mating tower on the valve

extension cable (C11).

Two connectors on C17 will remain disconnected. These are used when

installing other UC4+ options.

10. Install the two 2-pin connectors on the end of cable C17 to the 3

rd

station of the block.

The connector marked “Main Down” goes on the same side of the block as

the hoses.

Advertising