8. Connect the CAN-bus cable C02B to the 4-pin AMP plug (P4) on C11 (Figure 29).

9. Connect C02B to each of the roll sensors. Follow existing cables and/or hydraulic lines.

10. Connect the sensor branch cable (C02) to the 4-pin AMP plug on C02B.

11. Route C02 to the wing sensors and main lift sensor and connect to the sensors. Follow

existing cables and/or hydraulic lines along the boom. Provide enough slack in all cables to
account for the movement of the main section, wings, and folding.

12. Route the main lift cable through the main lift mounting bracket tube to provide additional

cable protection

13. Cable-tie the installed cables every 12 inches.

Figure 29: Cable Configurations: C02, C02B and C11