7 Position Sensor Installation

1. Remove the rubber bumpers on both ends of the roll frame (Figure 12).

Figure 12: Rubber Bumper Location

2. The position sensor (E06) should be mounted such that the largest amount of travel of the

sensor can be utilized without exceeding the travel limit. The sensor install length is 17”
(430mm) center to center with ±3.5” (±90mm) travel recommended. It should be mounted
in a location where the sensor will mount without binding or contacting and that is
perpendicular to the direction of travel. Roll the boom fully in each direction and take
measurements to ensure the travel limit is not exceeded.

3. Measure 12-3/4” (325mm) from the centerline of the intermediate frame and boom center

frame towards the left side of the sprayer (when looking from the rear of the sprayer).

Figure 13: Measurement from Centerline of Intermediate Frame (Looking from the Rear)

12-3/4”

(325mm)

Bumper