NORAC UC5-BC-JD08A User Manual

Page 33

Advertising
background image



30

5. Loosen the plastic port plugs and extend the cylinder to line up the hole in the intermediate

frame and the cylinder.

6. Install B10 from the rear of the sprayer through the intermediate frame and the cylinder

adding a mounting plate between both sides of the cylinder and the frame. Add the final
plate to the front side of the intermediate frame.

Figure 31: Upper Pin Installation

7. Using the 3/8” drill bit (M10), center the rear plate and pin on the intermediate frame. Drill

through the frame plate from the rear. Clamp the plate in place if desired.

8. After drilling through the first flange of the intermediate frame, align the mounting plates

and slide the drill through all 3 plates to guide and drill through the second flange.

Figure 32: Drilling the Flanges

9. Deburr the holes. Install the mounting bolts into the holes and snug. Drill the second set of

holes and install the mounting bolts. Torque the bolts to 20 ft-lbs (27 Nm).

Figure 33: Upper Pin Installed

Advertising