Compliant installation – Carrier Access Adit 3500 User Manual

Page 7

Advertising
background image

Adit 3500 - Release 1.6

7

Quick Start Guide

Installation

Compliant Installation

NOTE:

It is important the DS1/E1 Network Interface Cables are secured separately from the

power and Signal Cables.

1. Inspect the unit.
2. Mount the unit.

z

Wall mounting installation, see Wall Mounting on page 9.

z

Wall mounting with Battery Backup Unit, see Battery Backup on page 12.

z

Rack mounting installation, see Rack Mounting on page 10.

3. Ground the unit.

WARNING!

T

HE

A

DIT

3500

IS

REQUIRED

TO

BE

PERMANENTLY

GROUNDED

FOR

THE

PROTECTION

OF

USERS

AND

SERVICE

PERSONNEL

. R

EFER

TO

Grounding the Unit

ON

PAGE

3

FOR

DETAILED

INSTRUCTIONS

.

4. Connect DS1 (T1), and Ethernet connections as needed.
5. Connect RS-232 connector and connect via HyperTerm on your PC.

Note: With this running before power is enabled, you can monitor the boot process.

6. Attach PBX and phone line cables.
7. Connect Power to the unit.
8. Monitor the boot process on your PC, when complete the status light should be green.
9. For any software enabled features, enter the key command. See the key command in the Adit

3000 CLI Reference Manual, for detailed information.

10. To verify use the show version command.
11. To provision the unit. See Web-Based Management on page 23, for detailed instructions.

Advertising