Form I-EEDU, P/N 150492 R6, Page 11

Specific Venting

Requirements (read all

before installing)

1. Type of Vent Pipe

Use either vent pipe approved for a Category III heater or appropriately sealed single-

wall pipe. Or, if at least half of the equivalent length of the vent system is vertical, vent

pipe approved for a Category I heater may be used. Single-wall pipe or double-wall

(Type B) vent pipe are suitable for use with a Category I heater.

Use only one of the flue pipe diameters listed in the Vent Length Tables for the furnace

size being installed.
2. Venter (Flue) Outlet

Size

Venter Outlet Diameter

75 - 200

4"

225 - 250

5"

300 - 400

6"

Venter Outlet Attachment Requirements:

If the pipe used in the vent run is larger than the diameter of the venter outlet (See

Vent Length Table 2, page 12),

make the transition at the venter outlet.

The venter is factory-installed as illustrated in

FIGURE 9A. If required, the venter housing may be rotated as

shown in

FIGURE 9B. The vent may be run in either of the three directions as indicated by 1, 2, and 3 in the illus-

trations. Follow the instructions to rotate the venter housing.

Instructions for Rotating Venter Housing

1) Remove the three screws (save screws) that attach the venter housing to the outlet duct (pipe from furnace to

the venter). The assembly will remain in place.

2) Remove the three screws holding the motor plate to the venter housing. Holding the motor, rotate the venter

housing to the alternate position (See

FIGURE 9B). Re-attach the motor plate to the housing. To ensure correct

venter wheel alignment, holes are provided in the motor plate.

3) Using the holes in the venter housing as a template, drill three 1/8" diameter holes in the outlet duct. Re-attach

the venter housing to the outlet duct using the three screws removed in Step 1). Rotation is complete.

DANGER

Failure to provide proper venting could result in death, serious injury, and /or property

damage. Unit must be installed with a flue connection and proper vent to the outside of the

building. Follow installation codes listed in Paragraph 1.4 and all venting instructions. Safe

operation of any gas-fired equipment requires a properly operating vent system, correct

provision for combustion air (See Paragraph 2.2) and regular maintenance and inspection.

See Hazard Levels, page 2.

DANGER

U

nits installed in multiples require individual vent pipe runs and vent caps. Manifolding of

vent runs is not permitted due to possible recirculation of combustion products into the

building and possible back pressure effects on the combustion air proving switch.

FIGURE 9B -

Alternate

Position of

the Venter

Housing

FIGURE 9A -

Factory-

Installed

Position of

the Venter

Housing

WARNING

Only the venter housing may be rotated. The motor and combustion air proving switch MUST remain

as received from the factory. Unsafe or improper operation will result if the standard position is

varied. See Paragraph 8.1 for explanation of combustion air proving switch.

6" (152mm)

clearance from

combustibles

A minimum of 12" (305mm) of straight pipe is required at the venter outlet (or transition fitting) before installing an

elbow in the vent system. An elbow should never be attached directly to the venter.