3 duct furnace airflow, 0 mechanical (cont'd), 2 venting (cont'd) – Reznor EEDU Unit Installation Manual User Manual

Page 14: 1 pressure drop and temperature rise by size, Horizontal vent terminal (figure 11b) clearances

Advertising
background image

Form I-EEDU, Page 14

6.2 Venting (cont'd)

6.0 Mechanical

(cont'd)

Venting Requirements cont'd)

FIGURE 11B - Horizontal Vent Terminal

A clearance thimble is required when flue pipe extends through combustible

materials. Follow the instructions of the thimble or vent pipe manufacturer.

Pitch flue pipe down

toward outlet 1/4” per foot for

condensate drainage. (NOTE: Slope

applies to entire horizontal vent run.)

12”

(305 mm)

minimum

Wall

Roof or Building Overhang

3 ft (1M)

minimum

6 ft (1.8M) minimum

Reznor Option CC1Vent

Cap - note positions of

vent cap openings

(shaded areas)

Parapet or

Adjoining Building

A clearance thimble is required when flue pipe extends through combustible

materials. Follow the requirements of the double-wall pipe manufacturer.

Pitch flue pipe down

toward outlet 1/4” per foot for

condensate drainage. (NOTE: Slope

applies to entire horizontal vent run.)

12”

(305 mm)

minimum

Wall

Roof or Building Overhang

3 ft (1M)

minimum

6 ft (1.8M) minimum

Reznor Option CC1

Vent Cap - note positions

of vent cap openings

(shaded areas)

Parapet or

Adjoining Building

Double-Wall

Vent Pipe*

*Follow the instructions in FIGURE 10B to join the

double-wall vent terminal section to a single-

wall vent run and to seal the connection.

6” (152mm) minimum

Single-Wall or Category III Vent Run

and Single-Wall Terminal End

Single-Wall or Category III Vent Run

and Double-Wall Terminal End

6.3 Duct Furnace

Airflow

To determine temperature rise, the inlet and outlet air temperatures should be mea-

sured at points not affected by heat radiating from the heat exchanger. The Tempera-

ture Rise and Pressure Drop chart shows the approved temperature rise range with the

required CFM and the internal pressure drop for each size of unit.
The duct furnace must be installed on the positive pressure side of the field-supplied

blower. The air throughput must be within the CFM range stated on the heater rating

plate. The air distribution must be even over the entire heat exchanger. Turning vanes

should be employed in elbows or turns in the air inlet to ensure proper air distribution

(See Paragraph 6.3.2).

6.3.1 Pressure Drop and

Temperature Rise by

Size

Size

75

100

125

140

170

200

225

250

300

350

400

Temperature

Rise

CFM P.D. CFM P.D. CFM P.D. CFM P.D. CFM P.D. CFM P.D. CFM P.D. CFM P.D. CFM P.D. CFM P.D. CFM P.D.

Model EEDU (80% thermal efficient)

50°F

1105 0.24 1475 0.43 1840 0.49 2065 0.65 2505 0.67 2945 0.67 3315 0.69 3685 0.67 4420 0.70 5160 0.75 5895 0.77

60°F

920 0.16 1225 0.30 1535 0.33 1720 0.43 2085 0.46 2455 0.46 2765 0.47 3070 0.45 3685 0.47 4300 0.52 4915 0.52

70°F

790 0.10 1050 0.21 1315 0.25 1475 0.32 1790 0.33 2105 0.35 2370 0.36 2630 0.34 3160 0.35 3685 0.38 4210 0.38

80°F

695 0.07 920 0.16 1150 0.20 1290 0.24 1565 0.25 1840 0.26 2070 0.27 2300 0.26 2765 0.27 3225 0.28 3685 0.28

90°F

615 0.05 815 0.12 1020 0.17 1145 0.20 1390 0.19 1635 0.20 1840 0.21 2045 0.20 2455 0.22 2565 0.23 3275 0.22

If it is determined that the blower CFM is greater than allowed or desirable, see Para-

graph 6.3.3 for instructions on determining the correct size of bypass duct required or

see the

APPENDIX, page 30, for instructions on converting the furnace for a higher

CFM application.

Structure

Minimum Clearances for Vent

Termination Location (all

directions unless specified)

Forced air inlet within 10 ft

(3.1m)

3 ft (0.9m) above

Combustion air inlet of another

appliance

6 ft (1.8m)

Door, window or gravity air inlet

(any building opening)

4 ft (1.2m) horizontally

4 ft (1.2m) below

3 ft (0.9m) above

Electric meter, gas meter * and

relief equipment

4 ft (1.2m) horizontally

Gas regulator *

3 ft (0.9m)

Adjoining building or parapet

6 ft (1.8m)

Grade (ground level)

7 ft (2.1m) above

*Do not terminate the vent directly above a gas meter or service

regulator.

Horizontal Vent Terminal (FIGURE 11B) Clearances

The location of the termination of the horizontal vent system

must be in accordance with National Fuel Gas Code Z223.1.

See table for required minimum clearances.
If the vent terminal is to be installed near ground level, position

it at least six inches above maximum anticipated snow depth.

NOTE: Maintain the required clearance from the wall to

the vent terminal cap for stability under wind conditions

and to protect the building.

Products of combustion can cause discoloration of some build-

ing finishes and deterioration of masonry materials. Applying a

clear silicone sealant that is normally used to protect concrete

driveways can protect masonry materials. If discoloration is

an esthetic problem, relocate the vent or install a vertical vent.