Swpk installation – Shellab SWPK User Manual

Page 9

Advertising
background image

9 |

P a g e

SWPK INSTALLATION

2. A section of the included ¼ inch outside dimension tubing may be used for this step.

3. Do not connect the output line to a water source, yet. This will be one of the final steps in

the installation process.

5)

S

ECURE THE

W

ATER

O

UTPUT

L

INE

1. Feed the water output line into the support clip located on the left side of the water filter

assembly, adjacent to the Absorber Filter.

Figure 7: Water Output Line Secured

6)

T

HREADING THE

W

ATER

I

NPUT AND

O

UTPUT

L

INES

Note: One person should hold the protective box cover of the SWPK near the mounted Filter

Assembly during this step. The other should thread the water lines through it.

1. Thread the water output and input lines through the hole in the protective cover box, on the

top left side of the box.

Figure 8: Water Lines Threaded

Advertising